The Capital Regional Southwest Water Services Commission is proceeding with a new portable water pipeline from Leduc, AB to serve the towns of New Sarepta, AB and Hay Lakes, AB, as a result of an increase in water users in the communities south of Edmonton. The project includes the construction of a new pipeline, a new booster station and modifications to existing pump station in Leduc, New Sarepta and Hay Lakes to accept the new pipeline.
Monad is engaged in the construction of a new booster station, which is approximately 8 km south of Beaumont, AB and to perform the modifications of piping and E&I at the existing pump stations. The site is Greenfield and consists of site preparation, a 22' x 28' pre-engineered building, corresponding concrete foundation, fabrication and installation of steel and plastic piping, pumps, electrical and controls, HVAC, painting, insulation and commissioning/start-up assistance.