| 1 |
Search Results |
 |
Alberta Clipper Pipelines
| Location: |
Various Locations (AB) (SK) |
| Description: |
Civil Work - Hardisty, Kerrobert, Milden |
| Built By: |
Monad Industrial Constructors Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
EPCOR E.L. Smith Water Treatment Plant - Dechlorination System
| Location: |
Edmonton, AB |
| Description: |
Facilitated the mechanical portion of the construction work |
| Built By: |
Monad Industrial Constructors Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
F3 Formaldehyde Line Expansion
| Location: |
Edmonton, AB |
| Description: |
Formaldehyde plant with silver catalyst reactor process |
| Built By: |
Monad Industrial Constructors Inc. |
|
|
|
|
 |
FAR #1 Mine Heater Installation
| Location: |
Ekati Diamond Mine, NT |
| Description: |
Installation of a heater module, fan and ducting to provide heating to the underground mining operations |
| Built By: |
Monad Industrial Constructors Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Highway 21 Regional Water System South Transmission Pipeline
| Location: |
Leduc, AB |
| Description: |
Construction of a new pipeline, a new booster station and modifications to existing pump station in Leduc, New Sarepta and Hay Lakes to accept the new pipeline. |
| Built By: |
Monad Industrial Constructors Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Incinerator & Sizer Buildings
| Location: |
Ekati Mine, NT |
| Description: |
Diamond Mine Expansion |
| Built By: |
Monad Industrial Constructors Inc. |
| Delivery Method: |
[PM] Project Management |
|
|
 |
Keystone Oil Pipeline Project
| Location: |
Hardisty, AB |
| Description: |
Greenfield general construction of a pump terminal and five pump stations near Hardisty, Lakesend, Monitor, Oyen, and Bindloss, Alberta. |
| Built By: |
Monad Industrial Constructors Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Mackay River SAGD Plant - Pad 23
| Location: |
Mackay River, AB |
| Description: |
Fabrication and Construction Services |
| Built By: |
Monad Industrial Constructors Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
MPL 400 Relocation
| Location: |
Prentiss, AB |
| Description: |
Installation of 25 year old equipment and piping |
| Built By: |
Monad Industrial Constructors Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Primrose North General Mechanical Project
| Location: |
Primrose, AB |
| Description: |
30,000 bpd SAGD plant including pile cutoffs, cast-in-place concrete, precast concrete, module setting, mechanical and piping installation |
| Built By: |
Monad Industrial Constructors Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Snap Lake Project - Underground Equipment Installation
| Location: |
Yellowknife, NT |
| Description: |
Diamond Mine |
| Built By: |
Monad Industrial Constructors Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Surmont Phase I
| Location: |
Ft. McMurray, AB |
| Description: |
Construction of above-ground pipelines |
| Built By: |
Monad Industrial Constructors Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Tucker Lake Thermal Project
| Location: |
Cold Lake, AB |
| Description: |
30,000 BPD Steam Assist Gravity Drain (SAGD) Plant |
| Built By: |
Monad Industrial Constructors Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
| |
| 1 |