| 1 2 3 4 5 6 7 8 9 10 ... |
Search Results |
 |
10 Dundas East (Toronto Life Square)
| Location: |
Toronto, ON |
| Description: |
Project includes 24 AMC cinemas, Future Shop, restaurants, various retailers, offices and major exterior advertising space |
| Built By: |
PCL Constructors Canada Inc. |
| Delivery Method: |
Construction Management - At Risk [CMR] |
|
|
 |
11th Floor Richardson Building
| Location: |
Winnipeg, MB |
| Description: |
Interior tenant fit-out. |
| Built By: |
PCL Constructors Canada Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
121 Research Drive, Innovation Place
| Location: |
Saskatoon, SK |
| Description: |
14,000 Square Meter, Six Level Office Structure |
| Built By: |
PCL Construction Management Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
130 Bloor Street West Renovation
| Location: |
Toronto, ON |
| Description: |
Structural Reinforcement of Existing Building for Six-level Condo |
| Built By: |
PCL Constructors Canada Inc. |
| Delivery Method: |
Construction Management - At Risk [CMR] |
|
|
 |
15 Craigside
| Location: |
Honolulu, HI |
| Description: |
Construction of a 13-story retirement facility. |
| Built By: |
Nordic PCL Construction, Inc. |
| Delivery Method: |
Traditional Bid [TB] |
|
|
 |
181 Queen Street - Base Building
| Location: |
Ottawa, ON |
| Description: |
New High-Rise Building, 12 Stories |
| Built By: |
PCL Constructors Canada Inc. |
| Delivery Method: |
Traditional Bid [TB] |
|
|
 |
2D MAW Command Operations Facility Cherry Point
| Location: |
Cherry Point, NC |
| Description: |
A two-story headquarters building at the Marine Corps Air Station Cherry Point, NC. |
| Built By: |
PCL Construction Services, Inc. |
| Delivery Method: |
Traditional Bid [TB] |
|
|
 |
3R Facility - Level 3/Kiewit
| Location: |
Ottawa, ON |
| Description: |
Electronic Equipment Facility
|
| Built By: |
PCL Constructors Canada Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
3rd Street Parkade
| Location: |
Calgary, AB |
| Description: |
Six-level Parking Addition |
| Built By: |
PCL-Maxam, a Joint Venture |
|
|
|
|
 |
44 King Street West - M&E Renovation
| Location: |
Toronto, ON |
| Description: |
Mechanical/electrical Renovation in 26-storey Downtown Office Building |
| Built By: |
PCL Constructors Canada Inc. |
| Delivery Method: |
Construction Management - At Risk [CMR] |
|
|
 |
4th Avenue +15 Bridge Fifth Avenue Place
| Location: |
Calgary, AB |
| Description: |
Plus 15 bridge over 4th Avenue. |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
5055 Wilshire Building Addition/Renovation
| Location: |
Los Angeles, CA |
| Description: |
Low-rise Office Building Renovation
|
| Built By: |
PCL Construction Services, Inc. |
| Delivery Method: |
Traditional Bid |
|
|
 |
55 West Church Street Mixed Use Building
| Location: |
Orlando, FL |
| Description: |
34-story high-end residential condominium tower and attached 12-story parking structure. |
| Built By: |
PCL Construction Services, Inc. |
| Delivery Method: |
Construction Management - At Risk [CMR] |
|
|
 |
68 Unit High Rise Apartments
| Location: |
Regina, SK |
| Description: |
Senior Citizens' Residence
|
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
77 King Street West Revitalization Project
| Location: |
Toronto, ON |
| Description: |
Renovation to existing building |
| Built By: |
PCL Constructors Canada Inc. |
| Delivery Method: |
Construction Management - At Risk [CMR] |
|
|
 |
7th Avenue Refurbishment, Phase 1 Centre Street - 2nd Street SW Block K Tender
| Location: |
Calgary, AB |
| Description: |
Light rail transportation platform and sidewalk refurbishment. |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
801 S Grand (Sky Lofts)
| Location: |
Los Angeles, CA |
| Description: |
Conversion "for sale" Condominiums. |
| Built By: |
PCL Construction Services, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
830 S. Flower Parking Structure
| Location: |
Los Angeles, CA |
| Description: |
603 stall parking structure to serve the Market Lofts project |
| Built By: |
PCL Construction Services, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
A.R. Williams Truck Shop and Office Expansion
| Location: |
Edmonton, AB |
| Description: |
Shop and office expansion |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
Abatement, Demolition & Seismic Upgrades, Wellington Building
| Location: |
Ottawa, ON |
| Description: |
Abatement, Demolition and Seismic Upgrade of Heritage Building |
| Built By: |
PCL Constructors Canada Inc. |
| Delivery Method: |
Traditional Bid [TB] |
|
|
| |
| 1 2 3 4 5 6 7 8 9 10 ... |